Projects (Supply and Install) - Technical Consultants Only
Share Projects (Supply And Install) - Technical Consultants Only Product Catalogue

Pre-Design Estimation Quote for:

Installation of In-Rack / Roof Level Sprinkler System Including:

Sprinkler / Deluge Control Valve:

  • ?? x ?? mm Installation Control Valve including
    • 1 x Maintenance By-Pass
    • 1 x Alarm Gong
    • 1 x Dual Booster Connections
    • 1 x Sprinkler Spares Box Complete
    • Full Block-Plan of Protected Area stipulating Full Design Parameters.

In-Rack / Roof Level? Sprinkler System:

Supply and Installation of

  • ?? x Roof Level Sprinkler Heads
  • ?? x In Rack Sprinkler Heads Water Shiels and Guards
  • All Mains and Range Piping From the ICV to the Remote Test Line
  • Piping Supports as per ASIB Rules
  • Remote Drain and Test Valves at the end of each Rack

Above Estimates Exclude the below:

  • Mains Piping as the Pump and Tank Location is yet to be Finalised
    • Tank Infill Mains
    • Suction Mains
    • Deliver Mains from the Pump to the Installation Control Valve
  • All Civil works such as:
    • ICV Chamber as per ASIB Approved Design
    • Pump House as per ASIB Approved Design
    • Pump Plinth
    • Tank Foundations as Per Manufacturer Specification
    • Trenching, Back Fill and Compaction
  • Client Appointed Building Engineer / Architect to confirm the Roof Structure can Support the Above Installation
  • Roofing Insulation to be Class A Non Combustible - should the Insulation be Combustible it will need to be Removed.

CATALOGUE NAME : Projects (Supply and Install) - Technical Consultants Only
CATEGORY : Commercial Construction / Demolition Industrial Mining / Quarry / Civil Works Production Services

Pre-Design Estimation Quote for:

Installation of In-Rack / Roof Level Sprinkler System Including:

Sprinkler / Deluge Control Valve:

  • ?? x ?? mm Installation Control Valve including
    • 1 x Maintenance By-Pass
    • 1 x Alarm Gong
    • 1 x Dual Booster Connections
    • 1 x Sprinkler Spares Box Complete
    • Full Block-Plan of Protected Area stipulating Full Design Parameters.

In-Rack / Roof Level? Sprinkler System:

Supply and Installation of

  • ?? x Roof Level Sprinkler Heads
  • ?? x In Rack Sprinkler Heads Water Shiels and Guards
  • All Mains and Range Piping From the ICV to the Remote Test Line
  • Piping Supports as per ASIB Rules
  • Remote Drain and Test Valves at the end of each Rack

Above Estimates Exclude the below:

  • Mains Piping as the Pump and Tank Location is yet to be Finalised
    • Tank Infill Mains
    • Suction Mains
    • Deliver Mains from the Pump to the Installation Control Valve
  • All Civil works such as:
    • ICV Chamber as per ASIB Approved Design
    • Pump House as per ASIB Approved Design
    • Pump Plinth
    • Tank Foundations as Per Manufacturer Specification
    • Trenching, Back Fill and Compaction
  • Client Appointed Building Engineer / Architect to confirm the Roof Structure can Support the Above Installation
  • Roofing Insulation to be Class A Non Combustible - should the Insulation be Combustible it will need to be Removed.

Pre-Design Estimation Quote for:

Installation of In-Rack / Roof Level Sprinkler System Including:

Sprinkler / Deluge Control Valve:

  • ?? x ?? mm Installation Control Valve including
    • 1 x Maintenance By-Pass
    • 1 x Alarm Gong
    • 1 x Dual Booster Connections
    • 1 x Sprinkler Spares Box Complete
    • Full Block-Plan of Protected Area stipulating Full Design Parameters.

In-Rack / Roof Level​ Sprinkler System:

Supply and Installation of

  • ?? x Roof Level Sprinkler Heads
  • ?? x In Rack Sprinkler Heads Water Shiels and Guards
  • All Mains and Range Piping From the ICV to the Remote Test Line
  • Piping Supports as per ASIB Rules
  • Remote Drain and Test Valves at the end of each Rack

Above Estimates Exclude the below:

  • Mains Piping as the Pump and Tank Location is yet to be Finalised
    • Tank Infill Mains
    • Suction Mains
    • Deliver Mains from the Pump to the Installation Control Valve
  • All Civil works such as:
    • ICV Chamber as per ASIB Approved Design
    • Pump House as per ASIB Approved Design
    • Pump Plinth
    • Tank Foundations as Per Manufacturer Specification
    • Trenching, Back Fill and Compaction
  • Client Appointed Building Engineer / Architect to confirm the Roof Structure can Support the Above Installation
  • Roofing Insulation to be Class A Non Combustible - should the Insulation be Combustible it will need to be Removed.