Re-create a Protected Area Block Plan of the Existing Sprinkler Control Valve as per the ASIB Report.

Block Plans

The block plan of the premises shall include the following showing:

  • The class or classes of the system to be installed according to the Hazard Class in the various buildings.
  • The extent of the protection.
  • The calculated flow and pressure requirement of the ICV.
  • The occupancy of each building.
  • A cross-section of the full height of the building or buildings indicating the height of the highest sprinkler concerning a stated datum level.
  • The Block plan is based on estimates taken during the site assessment and is not a substitute for complete hydraulic calculations.
  • A block Plan will not be approved by the ASIB without the full Hydraulic Calculations

The Framed A3 Block Plan shall be Mounted in the Valve Chamber and Pump House (If Applicable)


CATALOGUE NAME : Projects (Supply and Install) - Technical Consultants Only
CATEGORY : Commercial Construction / Demolition Industrial Mining / Quarry / Civil Works Production Services

Re-create a Protected Area Block Plan of the Existing Sprinkler Control Valve as per the ASIB Report.

Block Plans

The block plan of the premises shall include the following showing:

  • The class or classes of the system to be installed according to the Hazard Class in the various buildings.
  • The extent of the protection.
  • The calculated flow and pressure requirement of the ICV.
  • The occupancy of each building.
  • A cross-section of the full height of the building or buildings indicating the height of the highest sprinkler concerning a stated datum level.
  • The Block plan is based on estimates taken during the site assessment and is not a substitute for complete hydraulic calculations.
  • A block Plan will not be approved by the ASIB without the full Hydraulic Calculations

The Framed A3 Block Plan shall be Mounted in the Valve Chamber and Pump House (If Applicable)


Re-create a Protected Area Block Plan of the Existing Sprinkler Control Valve as per the ASIB Report.

Block Plans

The block plan of the premises shall include the following showing:

  • The class or classes of the system to be installed according to the Hazard Class in the various buildings.
  • The extent of the protection.
  • The calculated flow and pressure requirement of the ICV.
  • The occupancy of each building.
  • A cross-section of the full height of the building or buildings indicating the height of the highest sprinkler concerning a stated datum level.
  • The Block plan is based on estimates taken during the site assessment and is not a substitute for complete hydraulic calculations.
  • A block Plan will not be approved by the ASIB without the full Hydraulic Calculations