Deluge Valve Overhaul including ASIB Tag

Make:
Model:
Size:

  • Isolate and Drain Deluge Valve
  • Strip out Existing Face and Clack Gaskets and attach them to the Outside of the Valve Body
  • Install New Face and Clack Gasket Set complete with ASIB Tag
  • Clean and Lubricate Moving Components
  • Clean Annular Groove
  • Strip out and Clean Strainers,
  • Reinstate Water
  • Test Alarm Gong and allow it to Ring Continuously for 30 Seconds
  • Activate Deluge to ensure
    • Spray Patterns are not obstructed
    • Spray Nozzles are not Blocked
    • The Spay Pattern fully covers the protected area
  • Reset Deluge Valve
  • Secure the Isolation Valve in the Open Position using the existing Lock and Chain

CATALOGUE NAME : Projects (Supply and Install) - Technical Consultants Only
CATEGORY : Commercial Construction / Demolition Industrial Mining / Quarry / Civil Works Production Services

Deluge Valve Overhaul including ASIB Tag

Make:
Model:
Size:

  • Isolate and Drain Deluge Valve
  • Strip out Existing Face and Clack Gaskets and attach them to the Outside of the Valve Body
  • Install New Face and Clack Gasket Set complete with ASIB Tag
  • Clean and Lubricate Moving Components
  • Clean Annular Groove
  • Strip out and Clean Strainers,
  • Reinstate Water
  • Test Alarm Gong and allow it to Ring Continuously for 30 Seconds
  • Activate Deluge to ensure
    • Spray Patterns are not obstructed
    • Spray Nozzles are not Blocked
    • The Spay Pattern fully covers the protected area
  • Reset Deluge Valve
  • Secure the Isolation Valve in the Open Position using the existing Lock and Chain

Deluge Valve Overhaul including ASIB Tag

Make:
Model:
Size:

  • Isolate and Drain Deluge Valve
  • Strip out Existing Face and Clack Gaskets and attach them to the Outside of the Valve Body
  • Install New Face and Clack Gasket Set complete with ASIB Tag
  • Clean and Lubricate Moving Components
  • Clean Annular Groove
  • Strip out and Clean Strainers,
  • Reinstate Water
  • Test Alarm Gong and allow it to Ring Continuously for 30 Seconds
  • Activate Deluge to ensure
    • Spray Patterns are not obstructed
    • Spray Nozzles are not Blocked
    • The Spay Pattern fully covers the protected area
  • Reset Deluge Valve
  • Secure the Isolation Valve in the Open Position using the existing Lock and Chain